از پایگاه های زیر برای دانلود مقالات فارسی تمام متن خود استفاده کنید
پرتال جامع علوم انسانی
پایگاه نشریات الکترونیکی دانشگاه تهران
http://journals.ut.ac.ir/page/main-page.html
پایگاه اطلاعات علمی جهاد دانشگاهی
Year |
Pages |
Title |
1998 |
13 |
The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects |
1998 |
8 |
Timing of control activities in project planning |
2010 |
12 |
Towards a multi dimensional project Performance Measurement System |
1998 |
17 |
Towards a smart project management information system |
2009 |
10 |
Training, motivation, and performance The case of human resource management in construction projects in Mashhad |
2006 |
10 |
Uncovering the trends in project management Journal emphases over the last 10 years |
2008 |
16 |
Using a risk based approach to project scheduling A case illustration from semiconductor manufacturing |
2000 |
16 |
Using analytic network process and goal programming for interdependent information system project |
2002 |
12 |
Using systems dynamics to better understand change and rework in construction project management systems |
2010 |
11 |
Competing management approaches in large engineering projects The Dutch RandstadRail project |
2005 |
21 |
The_potential_of_dialogue_in_a_municipal_development_project_action_research_and_planning_practice Voices of researchers |
لینک دانلود:
http://s3.picofile.com/file/7671370321/Control_Project_Articles_P7.rar.html
Year |
Pages |
Title |
1998 |
14 |
System Dynamics in Project Management Assessing the Impacts of Client Behavior |
2011 |
12 |
Systems thinking in innovation project management A match that works |
2010 |
8 |
Task completion competency and project management performance The influence of control and user contribution |
2013 |
12 |
Technical and institutional factors in the emergence of project management |
2007 |
11 |
The application of cognitive mapping methodologies in project management research |
2008 |
9 |
The balance between order and chaos in multi project firms A conceptual model |
2009 |
8 |
The effectiveness of resource levelling tools for Resource Constraint Project Scheduling Problem |
2011 |
14 |
The effects of schedule- driven project management in multi project environments |
2003 |
9 |
The impact of government practice on the ability of project managers to manage |
2010 |
9 |
The improvement paradox in project contexts- A clue to the way forward |
2010 |
15 |
THE RELATION BETWEEN ORGANIZATIONAL & PROFESSIONAL COMMITMENT IN CASE OF PROJECT WORKERS IMPLICATIONS FOR THE PROJECT MANAGEMENT PROFESSION |
لینک دانلود:
http://s1.picofile.com/file/7671367311/Control_Project_Articles_P6.rar.html
Year |
Pages |
Title |
2008 |
12 |
Preparing project managers to deal with complexity – Advanced project management education |
2002 |
9 |
Project Alliancing vs Project Partnering |
1999 |
15 |
Project evaluation and selection in a network of collaboration A consensual disaggregation multi criterion approach |
2003 |
19 |
project management concepts, methods &application |
2012 |
12 |
Project management office a knowledge broker in project based organisations |
2005 |
10 |
Project management turnover causes and effects on project performance |
2009 |
12 |
Quantifying schedule risk in construction projects using Bayesian belief networks |
2011 |
9 |
Resource allocation in dynamic PERT networks with finite capacity |
2000 |
9 |
Safety regulation changes during projects the use of system dynamics to quantify the eects of change |
2004 |
17 |
Software project control centers concepts and approaches |
2012 |
12 |
System Dynamics (SD) based concession pricing model for PPP highway projects |
لینک دانلود:
http://s2.picofile.com/file/7671364729/Control_Project_Articles_P5.rar.html
Year |
Pages |
Title |
2012 |
12 |
Measuring the efficiency of project control using fictitious and empirical project data |
2010 |
6 |
Modeling and Analysis of Mechanization Projects of Wheat Production by GERT Networks |
2002 |
26 |
modeling project management performance |
2012 |
8 |
Modelling and Simulation of Power Grid Engineering Project based on System Dynamics on the Background of Smart Grid |
2013 |
13 |
Monitoring project duration and cost in a construction project by applying statistical quality control charts |
2004 |
10 |
MPCS Multidimensional Project Control System |
2013 |
16 |
National culture differences in project management Comparing British and Arab project managers' perceptions of different planning areas |
2012 |
10 |
Optimum budget allocation method for projects with critical risks |
2009 |
9 |
Organizing for innovation in a product development project Combining innovative and result oriented ways of working – A case study |
2008 |
11 |
Outcome based project management education for emerging leaders- A case study of teaching and learning project management |
2008 |
8 |
Prediction of project outcome The application of statistical methods to earned value management and earned schedule performance indexes |
لینک دانلود:
http://s3.picofile.com/file/7671362789/Control_Project_Articles_P4.rar.html
Year |
Pages |
Title |
2003 |
21 |
Evaluating the learning effectiveness of using simulations in software project management education results from a twice replicated experiment |
2006 |
9 |
External disturbance control for software project management |
2007 |
11 |
Fuzzy critical chain method for project scheduling under resource constraints and uncertainty |
2012 |
12 |
Getting it done - Critical success factors for project managers in virtual work settings |
2004 |
9 |
Hard and soft projects - a framework for analysis |
2010 |
9 |
HRM in project groups The effect of project duration on team development effectiveness |
2012 |
10 |
Impact of sensitivity information on the prediction of project's duration using earned schedule method |
2008 |
4 |
Innovation in project management |
2011 |
14 |
Integrated visualized time control system for repetitive construction projects |
2011 |
16 |
Managing projects from a client perspective The concept of the meetings flow approach |
2008 |
10 |
Managing public private megaprojects Paradoxes, complexity, and project design |
لینک دانلود:
http://s3.picofile.com/file/7671361498/Control_Project_Articles_P3.rar.html
Year |
Pages |
Title |
2010 |
10 |
Applying the analytic hierarchy process to evaluation of the national nuclear R&D projects The case of Korea |
2010 |
8 |
Assessing Extension of Time delays on major projects |
2004 |
17 |
Choosing a quality improvement project using the analytic hierarchy process |
2002 |
17 |
Conceptual Simulation Model for Strategic Decision Evaluation in Project management |
2012 |
10 |
Construction project change management in Singapore Status, importance and impact |
2008 |
7 |
Defining uncertainty in projects - a new perspective |
2012 |
11 |
Delay causes in Iran gas pipeline projects |
2006 |
14 |
Developing activity duration specification limits for effective project control |
2005 |
14 |
Dynamic planning and control methodology for strategic and operational construction project management |
2006 |
14 |
Environmental factors and work performance of project managers in the construction industry |
2012 |
11 |
Estimating a project's profitability- A longitudinal approach |
لینک دانلود:
http://s1.picofile.com/file/7671356448/Control_Project_Articles_P2.rar.html
Year |
Pages |
Title |
2012 |
13 |
A conceptual model for project management of exploration and production in the oil and gas industry The case of a Brazilian company |
2010 |
10 |
A control system project development model derived from System Dynamics |
2006 |
16 |
A discrete event simulation model in the case of managing a software project |
2005 |
15 |
A hierarchical approach to multi project planning under uncertainty |
2013 |
7 |
A history of project management models From pre models to the standard models |
2009 |
12 |
A model based DSS for integrating the impact of learning in project control |
2008 |
17 |
A representation model for the solving time distribution of a set of design tasks in new product development (NPD) |
2012 |
12 |
Advanced linear scheduling program with varying production rates for pipeline construction projects |
2012 |
14 |
Advancing project and portfolio management research Applying strategic management theories |
2010 |
7 |
An extension of the EVM analysis for project monitoring The Cost Control Index and the Schedule Control Index |
2000 |
7 |
An investigation into the fundamentals of critical chain project scheduling |
لینک دانلود:
http://s2.picofile.com/file/7671352682/Control_Project_Articles_P1.rar.html
این وبلاگ جهت به اشتراک گذاری اطلاعات و تعامل با دانشجویان ایجاد شده است.
با توجه به مشکلاتی که اخیراً در دسترسی دانشجویان ایرانی به سایتهای علمی ایجاد شده، در این وبلاگ تلاش می کنم در حد امکان دسترسی به برخی مقالات منتخب را فراهم کنم.
به امید بهروزی هر انسان در هر جای جهان؛ از دانشمندان و دانشجویان گرفته تا آن فقیران لطیف خوش نفس